There is still no information on where and exactly what the new crossing at location A will be. That's the one that could block access to the marinas in Ipswich. However there is a strong lobby to raise the height of the planned crossing to 20-25 metres which would mean most of us wouldn't have to call for a bridge opening.
Crossing C I assume will be an upgraded path across the lock for pedestrians and bikes.
On the website you can see the latest consultation documents
https://www.suffolk.gov.uk/roads-an...nd-transport-planning/upper-orwell-crossings/
However, forumites will be concerned to note that that analysis of the respondents shows that the transgender community is under represented. The religious breakdown of respondents is also included. All of which goes to prove that consultation as local authorities see it is not necessarily connected with the actual issues in hand.
Crossing C I assume will be an upgraded path across the lock for pedestrians and bikes.
On the website you can see the latest consultation documents
https://www.suffolk.gov.uk/roads-an...nd-transport-planning/upper-orwell-crossings/
However, forumites will be concerned to note that that analysis of the respondents shows that the transgender community is under represented. The religious breakdown of respondents is also included. All of which goes to prove that consultation as local authorities see it is not necessarily connected with the actual issues in hand.