The winter 'to-do' list

Phoenix of Hamble

Well-Known Member
Joined
28 Aug 2003
Messages
20,966
Location
East Coast
mishapsandmemories.blogspot.com
The winter \'to-do\' list

So come on 'fess up....

Who hasn't got even half way through their winter to-do list?

Me...?

Well, I had 71 things on mine (yes...71... its a MAB)... and I've done 13 of them, with a further dozen still optimistically due to be completed..... I have however, done at least 10 other jobs that weren't on the priority list.... /forums/images/graemlins/grin.gif
 
Re: The winter \'to-do\' list

Fully fix the radar tower mount struts Nope
Install Gas Alarm properly Yep
Look at Wind Generator installation Yep
Get the Wind Instrument fixed (warranty) Yep
Get the electrical issues fixed (warranty) Nope-dealer issue
Install Grab Handles to side of Binnacle Yep
Change from Camping Gaz to Calor and have dual switchable regulators to swap into either This weekend
Change position of Log Impeller to Centreline in front of keel, aft of depth transducer. Nope
Design and mock up the holding tank installation in the workshop area. Yep
Service the engine, change the anti freeze Yep
Renew Fuel and Water filters all round the boat Nope
Look at and install 110a alternator in place of current 60a Nope
Install Adverc Smart battery charging Nope
Install the galley footpump and tee it into sea water and freshwater with added separate tap to galley. Yep
Add submersible cleats to transom step for tying off dinghy Nope
Add hardpoint to anchor locker for bitter end Yep
Add halyard tailbag to anchor locker for windlass remote controller Nope
Add graphics to underside of anchor locker lid for chain length marking diagram Nope
Add light to inside of anchor locker Nope
Add Cockpit low level lighting Nope
Add Cockpit Hi Fi speakers. Need speaker back boxes Yep
Add Sub Woofer to Cabin Hi Fi system Nope
Re mount the existing Hi Fi Speakers for better response Nope
Revise Forecabin strake trim to give more clearance and improve gap condition to hull side Yep
Install permanent ventilator to forecabin Nope
Install underbunk ventilation reticulated foam to aft and forecabins 1/2 done
Varnish seal all plywood edge end grain to all surfaces under sole. Yep
Service the outboard Nope
Antifoul of course. Nope
harness point in cockpit Yep x 2
helmsmans seat Nope
 
Re: The winter \'to-do\' list

Reticulate foam - about 40 quid a berth
or
Slat kit from IKEA and cut it to suit. 24 quid a double.
 
Re: The winter \'to-do\' list

Half way through winter and half way through the list which consists of only one item
.
.
.
.
.
.
.keep sailing! The moorings are free, The town quays are free, the anchorages are free and ther's no other boggers about to get in my way while i pop below to make a cup of Islay Tea.

Sheer Bliss
 
Re: The winter \'to-do\' list

I'm on my third boat in 25 years. Just keep the same list and change the name of the boat at the top! /forums/images/graemlins/grin.gif
 
Re: The winter \'to-do\' list

Is it only me that hasn't even started the winter to do list, been too busy sitting in front of fire watching logs burn!!
 
Re: The winter \'to-do\' list

I call ours the Spring 'to-do' list, so as we've been waiting for spring to start, this weekend will be the first full day at the boat yard. SWMBO refuses to scrape, paint or chip if she can't feel her fingers and/or ears.

Still, I've got one and a few halves ticked out of the 22 on the list. The big jobs are:
Fit 2nd halyard winch
scrape deck paint off cabin top and replace
fit new sound insulation in engine
find water leak in exhaust
fix water pump
find oil leak
clean oil out of the bilges .... again

plus all the usual varnishing and antifouling
 
Re: The winter \'to-do\' list

I havent even started on mine yet!! Got a month off after leaving here, they will all be done! Watermaker service first job!
 
Re: The winter \'to-do\' list

Not to bad :

Change anodes - Done

Replace Heads inlet fitting - Done (boatyard)

Remove doggy-protection netting from guard rails - Done

Refit battery charger - Done

Wire up GPS repeater in cockpit - not yet

Fix leaking galley tap - Done (I think)

Have all gas piping replaced (well out of date) - Done (by Gas Engineer)

Inspect/clean/replace all reefing lines - partly done

Check slightly sulky log - Done

Draw up wiring diagram for the boat - In progress

Service winches - Nope (can wait until we're afloat)

Service heads - done

Perhaps begin a rolling program of replacing blocks etc - on hold due to restrictions imposed by the Management /forums/images/graemlins/crazy.gif

Check rigging, inspect/clean/replace halliards, replace all bulbs - was going to do it, but Management said "You'd better have someone check the rigging who knows what they're doing" Sigh.

Also assorted other jobs cropped up along the wayand have been dealt with.

Antifouling done; was hoping to wash & polish topsides on Sunday but the weather doesn't look as if it will play ball

Overall - 6/10, can do better
 
Re: The winter \'to-do\' list

I went to the boat on Monday to do a job. Shovelled the snow off the deck, took off the cover after an hour wrestling with frozen knots. Salted the main hatch to melt the ice so I get down below. Installed my new optimus parafin stove. Retied the cover then drove home. Took out my list to cross off another job and IT WAS NOT ON THE LIST. Oh the gloom, I was so depressed. Three hours work wasted it seemed.
 