PaulR
Well-Known Member
Anyone got any experience of this?
have missed slot at my club for mast crane and planning to replace standing rigging this winter- in theory it must be possible to support mast with halyard/other stays whilst replacing each stay one by one - anyone done it ? any tips?
cost of crane coming to club to take down one mast is offputting and cost of hiring cherry picker for access almost as bad.
Not sure what pro riggers take on it might be?
<hr width=100% size=1>
have missed slot at my club for mast crane and planning to replace standing rigging this winter- in theory it must be possible to support mast with halyard/other stays whilst replacing each stay one by one - anyone done it ? any tips?
cost of crane coming to club to take down one mast is offputting and cost of hiring cherry picker for access almost as bad.
Not sure what pro riggers take on it might be?
<hr width=100% size=1>