emandvee44
Well-Known Member
We are not using the boat this year, mainly due delays caused by the virus and other commitments. I have identified some projects to undertake, one of which is to re-rig the reefing system. The reefing lines are in good shape, but are in my opinion too thick. They are all 14mm braid and the stoppers struggle to close on them, and there is the added friction due to their size. I am planning to replace with 12mm braid on braid. Selden have an operational diagram which gives a good idea of what is inside the boom.

I assume that I will have to remove the boom outer end fitting which is secured with star screws and pull the internal car out of the boom, at which point the old 1 & 2 reef lines can be removed (no.3 is a single line) It seems likely that some mice
will be required to run the new lines. I can only guess as to the length of the lines so I will have to do the job in two stages; remove old lines, mouse. Measure (twice
) and make up new lines and install.
Any comments /tips?
Thanks,
M.

I assume that I will have to remove the boom outer end fitting which is secured with star screws and pull the internal car out of the boom, at which point the old 1 & 2 reef lines can be removed (no.3 is a single line) It seems likely that some mice
Any comments /tips?
Thanks,
M.