Malabarista
Well-Known Member
Hello again
After an epic sanding, grinding and flowcoating (PW) experience i hope never to have to repeat on my six water tank chambers i am confused about the plumbing. Each tank ( Port and Starboard) is furnished with a breather and a single outlet. The Port tank has a filler. The only filling connection between the two is achieved by ( i assume) the water pressure in the Port tank coming out of the outlet in the Starboard tank when i open the gate valve connecting the two tanks. The outlet on both tanks is around 15mm. Seems a bit small to equalise when filling. Am i missing something obvious?
Should there be, say, a 25-30mm pipe between the two with a gate valve to enable water to rapidly equalise?
Apologies if this has been covered i only did a quick search
Dave
After an epic sanding, grinding and flowcoating (PW) experience i hope never to have to repeat on my six water tank chambers i am confused about the plumbing. Each tank ( Port and Starboard) is furnished with a breather and a single outlet. The Port tank has a filler. The only filling connection between the two is achieved by ( i assume) the water pressure in the Port tank coming out of the outlet in the Starboard tank when i open the gate valve connecting the two tanks. The outlet on both tanks is around 15mm. Seems a bit small to equalise when filling. Am i missing something obvious?
Should there be, say, a 25-30mm pipe between the two with a gate valve to enable water to rapidly equalise?
Apologies if this has been covered i only did a quick search
Dave