Cookie Jar
Well-Known Member
Hi Everyone,
"Cookie Jar" is about to get a new coat of paint on the topsides and I have enough paint to give it 3 coats, but reading through the instructions (TOPLAC, one component) and my temperature conditions, it says:
Touch Dry: 2hrs
Overcoat: Min 8hrs Max 2 days
Does this mean that I really have to wait 8hrs between each coat?
Couldn't it be done after is "touch dry"? Could you please guide me through this?
I'm just not understanding the need to wait so much time if the paint is already "touch dry" after 2 hours
Thanks!
"Cookie Jar"
"Cookie Jar" is about to get a new coat of paint on the topsides and I have enough paint to give it 3 coats, but reading through the instructions (TOPLAC, one component) and my temperature conditions, it says:
Touch Dry: 2hrs
Overcoat: Min 8hrs Max 2 days
Does this mean that I really have to wait 8hrs between each coat?
Couldn't it be done after is "touch dry"? Could you please guide me through this?
I'm just not understanding the need to wait so much time if the paint is already "touch dry" after 2 hours
Thanks!
"Cookie Jar"