tillergirl
Well-Known Member
Permanent
1. Some new depths (not likely to affect us) and a new pontoon at the Erith rands in the River Thames;
2. Reduction of depth at the Caister Shoal. Again not likely to affect us if the channel is followed;
Temporary
1. Colne No 31 (Fingringhoe Ballast Quay) is back on station;
2. London Array is doing some work on the Brit/Ned rock berm/Power cable crossing point involving divers and support boats. This is near the North cardinal they put in to mark this point. Mooring buoys may be left in over night (lit) and two Ribs will act as guard boats for small craft.
1. Some new depths (not likely to affect us) and a new pontoon at the Erith rands in the River Thames;
2. Reduction of depth at the Caister Shoal. Again not likely to affect us if the channel is followed;
Temporary
1. Colne No 31 (Fingringhoe Ballast Quay) is back on station;
2. London Array is doing some work on the Brit/Ned rock berm/Power cable crossing point involving divers and support boats. This is near the North cardinal they put in to mark this point. Mooring buoys may be left in over night (lit) and two Ribs will act as guard boats for small craft.