tillergirl
Well-Known Member
Permanent
Only a preliminary notice advising of changes during August to the Yantlet Channel buoyage which is going from Safe Water marks to paired lateral buoyage.
Temporary
1. Work on a new Jetty at Gravesend
2. The Fog Signal on Turbine G11 at the Thanet Wind farm is not functioning (image showing position - the bottom right hand or SE corner)
3. Usual cable burial work in-field at the London Array
Web Site just be updated now.
Only a preliminary notice advising of changes during August to the Yantlet Channel buoyage which is going from Safe Water marks to paired lateral buoyage.
Temporary
1. Work on a new Jetty at Gravesend
2. The Fog Signal on Turbine G11 at the Thanet Wind farm is not functioning (image showing position - the bottom right hand or SE corner)
3. Usual cable burial work in-field at the London Array
Web Site just be updated now.