tillergirl
Well-Known Member
Power Cut via damage to overhead power cable in a residential street in West Mersea.
Permanent (Unexciting)
1. Two reduced depths in Blackwall Reach of the Thames close on the west bank;
2. Change of Fog Signal from the Long Sand head north cardinal. Now a bell not a 'Whis';
3. Three 'ship' lit moorings in the River Thames aff Shell haven are now not lit.
Temporary
1. Position of obstruction on the seabed near Roughs Buoy has been amended. It is right by the Buoy, just to the north;
2. River Colne, Harbourmaster announces tonight the wreck now removed. Wreck buoyage will be removed shortly;
3. London Array - Foulger's Gat - notification that the Jack-Up vessel has finished work and that vessel plus the back-up vessel has left the Wind Farm. No worries about Foulger's.
Err - no notification of dredging this week in the Port of Wells. Oddbodkins!
Usual detail on: http://www.crossingthethamesestuary.com/page9.html
Hey ho.
Permanent (Unexciting)
1. Two reduced depths in Blackwall Reach of the Thames close on the west bank;
2. Change of Fog Signal from the Long Sand head north cardinal. Now a bell not a 'Whis';
3. Three 'ship' lit moorings in the River Thames aff Shell haven are now not lit.
Temporary
1. Position of obstruction on the seabed near Roughs Buoy has been amended. It is right by the Buoy, just to the north;
2. River Colne, Harbourmaster announces tonight the wreck now removed. Wreck buoyage will be removed shortly;
3. London Array - Foulger's Gat - notification that the Jack-Up vessel has finished work and that vessel plus the back-up vessel has left the Wind Farm. No worries about Foulger's.
Err - no notification of dredging this week in the Port of Wells. Oddbodkins!
Usual detail on: http://www.crossingthethamesestuary.com/page9.html
Hey ho.
Last edited: