Notice to Mariners Week 4

Tiller Girl

Well-Known Member
Joined
9 Dec 2013
Messages
302
Location
West Mersea
Visit site
One UKHO Permanent but not really relevant

1. Three very small reductions in depth over the Buitenbanken (bet 15m and just under 20m)

Temporary - loads

1. Brightlingsea Harbour - dreding pipe from the marina to outside of the marina - see image on web page;
2. Great Yarmouth - Flood Wall Repair Works – Berths 21H - 21B - 18th Janaury to mid February, extensive works, see warnings;
3. Great Yarmouth - Reconstruction and Piling Works – Berths 27A & 27B - 1st February to end of July - extension into the harbour for extensive works, see warnings;
4. Associated British Ports Ipswich - New Cut Construction Works - Works on the Tidal Barrier from 18th January, channel restricted, see details;
5. Lowestoft - SEWER OUTFALL EAST CARDINAL BUOY - The Sewer Outfall East Cardinal Buoy - LIGHT UNLIT;
6. Port of Wells continues dredging this week again.

C'est toutes. Je suis en vacance depuis deux semaines donc je cannot prendez le laptop pars'que la femme est murderest donc rien pour NtM pour deux semaines!

Sorry forgot to add the page reference: http://www.crossingthethamesestuary.com/page9.html
 
Last edited:
Addition!

Crouch Harbour Master has advised (NtM No 4):

RIVER CROUCH - Burnham Town Pontoon

Please be advised that the Town Pontoon at Burnham-on-Crouch has now been repaired and is back in operation for both vessels mooring on the outer end and public access from the shore.
 