tillergirl
Well-Known Member
UKHO and Trinity House Permanent, Preliminary and Temporary
1. NORTH SEA - Netherlands Sector - Buoyage. - Two temporary cardinal buoys ‘en route’ between the North Hinder system and towards the Westerschelde. - See the image on the usual page: http://www.crossingthethamesestuary.com/page9.html
2. ENGLAND - Thames Estuary - Depths. - Two reduced depths in the Deep Water channel of the Knock John Channel. Not likely to hinder leisure craft.:
3. ENGLAND - East Coast - Depths. - Eight reduced depths on the west side of the Corton Sand (which is encroaching). Note in partnership with the following Trinity House NtM.;
4. EAST COAST OF ENGLAND - APPROACHES TO GREAT YARMOUTH - HOLM CHANNEL & HOLM SAND - Movement of six buoys around the Holm Sand. The image includes reduced soundings already reported vide NtoM Nos 272, 2380(P) and 4128 (above).
Local
1. SEA REACH FENDER REPAIR OIKOS JETTY NO. 1 - repair work will commence on Sunday 19th August 2018 to fenders on OIKOS Jetty No. 1. These works are expected to take 4 to 5 days to complete during which time a ‘Proceed with Caution’ will be issued by London VTS where mariners are requested to be mindful of their wash.
2. GRAVESEND REACH JETTY REINSTATEMENT AND WORKS CUSTOMS JETTY - work will commence on or around 28th August 2018 on the reinstatement of the pontoon for Customs Jetty. The works will be carried out with the assistance of SWS SUFFOLK and will consist of removing the brow before reinstating the pontoon, associated fixings and steelwork. The brow will then be reinstated.
3. Harwich Harbour Maintenance dredging – Harwich Haven berths and approaches - on or about the 21st August 2018 the plough dredger FORTH DRUMMER will commence maintenance dredging of the Harwich Haven berths and approaches for a period of approximately 14 days. )n or about the 24th August 2018 the trailer suction dredger Barent Zanen will commence maintenance dredging of the Harwich Haven berths and approaches for a period of approximately 8 days. Survey work in regard to the dredging operations will be conducted by the Harwich Haven Authority vessel Egret. Material from these areas will be disposed to the TH027: Harwich Haven disposal site.
4. Port of Wells - dredging;
5. Blakeney Harbour - The light on Harbour Entrance buoy no. 4 (N 52° 58.777’ E 000° 57.530’) has now been reinstated. Flash sequence is FlG(2.5s).
I can't remember whether it has been said, so in case it hasn't, Havengore Bridge is operational.
CLACTON ON SEA AIRSHOW 23rd /24th August 2018 - between the hours of 11:00 BST to 21:00 BST Thursday 23rd and 11:00 BST to 17:00 BST Friday 24th an Airshow will be taking place offshore from Clacton Seafront.
An area starting Six Cables East of Clacton Pier, approximately Seven Cables to seaward, running parallel to the Shore to Lion Point Jaywick in the West. This area will be a restricted area for all vessels, other than official vessels patrolling or any craft participating in a programmed display on behalf of the show organisers.
Restricted Area:
A. 51’47.55N – 001’10.20E Inshore Limit East of Clacton Pier.
B. 51’46.91N – 001’10.83E Seaward Mark East of Clacton Pier.
C. 51’45.76N – 001’07.51E Seaward Mark West of Clacton Pier,
D. 51’46.30N – 001’07.20E Inshore Limit West of Clacton Pier.
Vessels are advised to keep clear of this area between the hours stated above. Anchoring is prohibited in this area. It is prohibited to launch or recover any vessels within this area during the stated times.
That's it.
1. NORTH SEA - Netherlands Sector - Buoyage. - Two temporary cardinal buoys ‘en route’ between the North Hinder system and towards the Westerschelde. - See the image on the usual page: http://www.crossingthethamesestuary.com/page9.html
2. ENGLAND - Thames Estuary - Depths. - Two reduced depths in the Deep Water channel of the Knock John Channel. Not likely to hinder leisure craft.:
3. ENGLAND - East Coast - Depths. - Eight reduced depths on the west side of the Corton Sand (which is encroaching). Note in partnership with the following Trinity House NtM.;
4. EAST COAST OF ENGLAND - APPROACHES TO GREAT YARMOUTH - HOLM CHANNEL & HOLM SAND - Movement of six buoys around the Holm Sand. The image includes reduced soundings already reported vide NtoM Nos 272, 2380(P) and 4128 (above).
Local
1. SEA REACH FENDER REPAIR OIKOS JETTY NO. 1 - repair work will commence on Sunday 19th August 2018 to fenders on OIKOS Jetty No. 1. These works are expected to take 4 to 5 days to complete during which time a ‘Proceed with Caution’ will be issued by London VTS where mariners are requested to be mindful of their wash.
2. GRAVESEND REACH JETTY REINSTATEMENT AND WORKS CUSTOMS JETTY - work will commence on or around 28th August 2018 on the reinstatement of the pontoon for Customs Jetty. The works will be carried out with the assistance of SWS SUFFOLK and will consist of removing the brow before reinstating the pontoon, associated fixings and steelwork. The brow will then be reinstated.
3. Harwich Harbour Maintenance dredging – Harwich Haven berths and approaches - on or about the 21st August 2018 the plough dredger FORTH DRUMMER will commence maintenance dredging of the Harwich Haven berths and approaches for a period of approximately 14 days. )n or about the 24th August 2018 the trailer suction dredger Barent Zanen will commence maintenance dredging of the Harwich Haven berths and approaches for a period of approximately 8 days. Survey work in regard to the dredging operations will be conducted by the Harwich Haven Authority vessel Egret. Material from these areas will be disposed to the TH027: Harwich Haven disposal site.
4. Port of Wells - dredging;
5. Blakeney Harbour - The light on Harbour Entrance buoy no. 4 (N 52° 58.777’ E 000° 57.530’) has now been reinstated. Flash sequence is FlG(2.5s).
I can't remember whether it has been said, so in case it hasn't, Havengore Bridge is operational.
CLACTON ON SEA AIRSHOW 23rd /24th August 2018 - between the hours of 11:00 BST to 21:00 BST Thursday 23rd and 11:00 BST to 17:00 BST Friday 24th an Airshow will be taking place offshore from Clacton Seafront.
An area starting Six Cables East of Clacton Pier, approximately Seven Cables to seaward, running parallel to the Shore to Lion Point Jaywick in the West. This area will be a restricted area for all vessels, other than official vessels patrolling or any craft participating in a programmed display on behalf of the show organisers.
Restricted Area:
A. 51’47.55N – 001’10.20E Inshore Limit East of Clacton Pier.
B. 51’46.91N – 001’10.83E Seaward Mark East of Clacton Pier.
C. 51’45.76N – 001’07.51E Seaward Mark West of Clacton Pier,
D. 51’46.30N – 001’07.20E Inshore Limit West of Clacton Pier.
Vessels are advised to keep clear of this area between the hours stated above. Anchoring is prohibited in this area. It is prohibited to launch or recover any vessels within this area during the stated times.
That's it.