1. ENGLAND - East Coast - Approaches to Lowestoft and Holm Sand - Depths. Drying height. - Three reduced soundings around the Holm Sand - the west edge very steep to and is encroaching the Corton Road: 4 reduced soundings in the approaches to Lowestoft. Two images on the usual page:
2. ENGLAND - East Coast - Blakeney Point E - Legend. - delete of a 'legend' "Planned". I haven't got any record of that on any of the charts in my possession so 'tis a mystery - but it isn't there now anyway. It was marked need the site of the cabling from the land point to the Sheringham Sands Wind Farm so I assumed it was something about that!
3. 301(P)/2018 ENGLAND - East Coast - Lowestoft SE - Works. Maritime limit. Buoyage. - This is buoyage for the First Phase of the East Anglia 1 Wind Farm. That Wind Farm is east of Lowestoft/Southwold but just west of the Deep Water and junction at the North Hinder. I have placed two images on the web site in the usual NtM 2018 list: the first to show the position, the second closer in to show the detail of the buoy, names and characteristics;
4. ENGLAND - East Coast - Roger Sand E - Buoyage. - slight move of two lateral buoys for the Freeman Channel leading to Boston, and the deletion of the Boston Roads Safe Water Buoy. Image:
5. ENGLAND - East Coast - Lower Hope Reach - Depth. - a new sounding off East Tilbury but at 8.3m, not very exciting for us.
Temporary
1. Dredging on Hickling Broad - Restricted Access to Hickling Staithe - Hickling Staithe and the boat dyke leading to the Staithe will be closed to navigation during weekdays from Monday 12 February until Friday 23 February 2018;
2. Port of Wells - dredging;
3. Port of London - ST CLEMENTS REACH GRAYS TERMINAL JETTY WORKS from today.
4. Essex Marina - dredging in and around the Marina until 28th March. Pontoons may be moved and temporary lit at night.
That is it.
http://www.crossingthethamesestuary.com/page9.html for details and images.
1. ENGLAND - East Coast - Approaches to Lowestoft and Holm Sand - Depths. Drying height. - Three reduced soundings around the Holm Sand - the west edge very steep to and is encroaching the Corton Road: 4 reduced soundings in the approaches to Lowestoft. Two images on the usual page:
2. ENGLAND - East Coast - Blakeney Point E - Legend. - delete of a 'legend' "Planned". I haven't got any record of that on any of the charts in my possession so 'tis a mystery - but it isn't there now anyway. It was marked need the site of the cabling from the land point to the Sheringham Sands Wind Farm so I assumed it was something about that!
3. 301(P)/2018 ENGLAND - East Coast - Lowestoft SE - Works. Maritime limit. Buoyage. - This is buoyage for the First Phase of the East Anglia 1 Wind Farm. That Wind Farm is east of Lowestoft/Southwold but just west of the Deep Water and junction at the North Hinder. I have placed two images on the web site in the usual NtM 2018 list: the first to show the position, the second closer in to show the detail of the buoy, names and characteristics;
4. ENGLAND - East Coast - Roger Sand E - Buoyage. - slight move of two lateral buoys for the Freeman Channel leading to Boston, and the deletion of the Boston Roads Safe Water Buoy. Image:
5. ENGLAND - East Coast - Lower Hope Reach - Depth. - a new sounding off East Tilbury but at 8.3m, not very exciting for us.
Temporary
1. Dredging on Hickling Broad - Restricted Access to Hickling Staithe - Hickling Staithe and the boat dyke leading to the Staithe will be closed to navigation during weekdays from Monday 12 February until Friday 23 February 2018;
2. Port of Wells - dredging;
3. Port of London - ST CLEMENTS REACH GRAYS TERMINAL JETTY WORKS from today.
4. Essex Marina - dredging in and around the Marina until 28th March. Pontoons may be moved and temporary lit at night.
That is it.
http://www.crossingthethamesestuary.com/page9.html for details and images.