tillergirl
Well-Known Member
Permanent
1. New editions of Charts 1606 - England - East Coast, Thames Estuary, Fisherman’s Gat to Princes Channel and 1609 - England - East Coast, Thames Estuary, Knock John Channel to Sea Reach on 27th July.
2. ENGLAND - East Coast - Orford Haven and Woodbridge Haven - NM Blocks for Charts 2693 and 2695 - the UKHO only show the positions of the Safe water buoys - refer to East Coast Pilot (http://www.eastcoastpilot.com/downloads.html ) for the downloads which show the full detail.
Temporary
1. Kingsnorth Power Station - Demolition of Remaining Boiler Structures - planned demolition event on 27th July 2017 at 15:00hrs. At that time the two remaining boiler structures at Kingsnorth Power Station will be demolished by use of a controlled explosion. (Intriging to consider the difference twix a 'demolition event' and a 'controlled explosion'!)
2. KING'S LYNN CONSERVANCY BOARD - The Wash - Approaches to King's Lynn - Additional Navigation Aid - a new red can called..... 'R'. There is a link to download the chartlet on my usual page (Temporary List) - http://www.crossingthethamesestuary.com/page9.html
3. Port of Wells - dredging;
4. Port of Ramsgate - Filming event - tonight between 2200 and 1am involving a local fishing boat, a safety boat and a controlled special effect fire on the fishing vessel.
5. River Crouch - Inner Whitaker South Cardinal - has lost its topmark - now was it yellow/black/yellow, black/yellow/black or what -I confess I would check..
That's it.
1. New editions of Charts 1606 - England - East Coast, Thames Estuary, Fisherman’s Gat to Princes Channel and 1609 - England - East Coast, Thames Estuary, Knock John Channel to Sea Reach on 27th July.
2. ENGLAND - East Coast - Orford Haven and Woodbridge Haven - NM Blocks for Charts 2693 and 2695 - the UKHO only show the positions of the Safe water buoys - refer to East Coast Pilot (http://www.eastcoastpilot.com/downloads.html ) for the downloads which show the full detail.
Temporary
1. Kingsnorth Power Station - Demolition of Remaining Boiler Structures - planned demolition event on 27th July 2017 at 15:00hrs. At that time the two remaining boiler structures at Kingsnorth Power Station will be demolished by use of a controlled explosion. (Intriging to consider the difference twix a 'demolition event' and a 'controlled explosion'!)
2. KING'S LYNN CONSERVANCY BOARD - The Wash - Approaches to King's Lynn - Additional Navigation Aid - a new red can called..... 'R'. There is a link to download the chartlet on my usual page (Temporary List) - http://www.crossingthethamesestuary.com/page9.html
3. Port of Wells - dredging;
4. Port of Ramsgate - Filming event - tonight between 2200 and 1am involving a local fishing boat, a safety boat and a controlled special effect fire on the fishing vessel.
5. River Crouch - Inner Whitaker South Cardinal - has lost its topmark - now was it yellow/black/yellow, black/yellow/black or what -I confess I would check..
That's it.
