tillergirl
Well-Known Member
Permanent
1. Three reduction of depths in the Steendiep (Channel heading east to the Hook of Holland) but all still + 8m so not really an issue for us;
2. Trinity House have notified their intention to move three of the 'Corton' buoys in the Holm Channel heading north to Great Yarmouth. The movements are slight, indeed so slight I can illustrate the moves. See the notice if you want the intended (on or after the 15th July) positions exactly see: http://www.crossingthethamesestuary.com/page9.html
Temporary
1. River Roach, the Black Edge No 1 light buoy is off station;
2. River Crouch - notification of movement of Wind Farm turbines to be landed off Holliwell Farm of the north Crouch bank. Big stuff moving there from 14th July for 2/3 weeks and anchoring as required for storage and unloading. Worth reading - see the Temporary list in the above reference.
3. Port of Wells still dredging.
That's it.
1. Three reduction of depths in the Steendiep (Channel heading east to the Hook of Holland) but all still + 8m so not really an issue for us;
2. Trinity House have notified their intention to move three of the 'Corton' buoys in the Holm Channel heading north to Great Yarmouth. The movements are slight, indeed so slight I can illustrate the moves. See the notice if you want the intended (on or after the 15th July) positions exactly see: http://www.crossingthethamesestuary.com/page9.html
Temporary
1. River Roach, the Black Edge No 1 light buoy is off station;
2. River Crouch - notification of movement of Wind Farm turbines to be landed off Holliwell Farm of the north Crouch bank. Big stuff moving there from 14th July for 2/3 weeks and anchoring as required for storage and unloading. Worth reading - see the Temporary list in the above reference.
3. Port of Wells still dredging.
That's it.