New washboards

Agree 100 %. Here are mine, need re-varnish through

WEB0827_zps3b045d89.jpg

That looks like proper teak to me - the Bee's knee's :encouragement:

Were they made from pieces of Decking- it's unusual to see caulked seams?
 
After spending the last two days doing the timber trim on the gunwales and handrails I am starting to see the beauty in stainless steel and aluminum.
 
That looks like proper teak to me - the Bee's knee's :encouragement:

Were they made from pieces of Decking- it's unusual to see caulked seams?

No it's Iroko strips glued to a ply backing. Total thickness of about 25mm so to fit snug into the slides.

My cockpit table, slide hatch, hatch garage and cockpit table is all done the same way.

I purchased to a load (2 cubic meters) of Iroko, African Mahogany and African rosewood when I was building my current boat so I do a fair bit of woodwork mainly inside.

Any outside woodwork is kept covered with canvas when not in use due to the sun damage at my location 30 degrees south

IMGP2574_zpsdbebabeb.jpg


WEB0838_zpsb0585a92.jpg
 
Last edited by a moderator:
Well that really was a project, how long did it take to build her

We purchased the hull and superstructure and trucked it to Johannesburg in January 2005. As can be seen we completed finished the outside with quite alot of engineering, internal fitting out and all the electrics.

We then moved it to Durban August 2009 where we had been slowly shaking it down with regular trips to Durban every month to two. We are now doing some day sailing to get more more used to the boat and to get SWMBO more experience.

Yes alot of work but I think it was worth it and have always enjoyed that kind of work as I used to be stuck in an office running a company designing computer software up until I retired 3 years ago and closed the business.
 
Top