New Walton Bridge

534l4rk

Well-Known Member
Joined
13 Apr 2010
Messages
242
Visit site
For those braving river conditions in next few weeks.

Info sourced from Contractors.


We will be switching our navigation management under Walton Bridge from the Walton bank to the Shepperton bank on 19/02/13. This is to permit installation of working platforms over the Shepperton navigation. These platforms hang down slightly below the structure soffit and hence would impinge on the navigation headroom. This configuration will remain in place for 2 – 3 weeks.
 
Last edited:
Bridge is coming on a pace now. All hangers in and road deck nearly complete. It is going to look quite a feature. Marlow bridge probably still trumps it but nevertheless it's
a welcome piece of engineering to the Thames. Looking forward to the official opening.
 
I should think the bridge is the quick bit, It will be the supporting infrastructure and new flyover/road layout that will take time.

The bridge itself looks almost finished. Is it going to remain that colour?
 