Re:The reason for extendING the TSS at Lands End
The change is intended to keep ships away from the “South-West Wave Hub” – an experimental 20 megawatt wave-powered power station. Construction work on the £30m project has yet to begin, but it is expected to be operational sometime in 2010.
The change is intended to keep ships away from the “South-West Wave Hub” – an experimental 20 megawatt wave-powered power station. Construction work on the £30m project has yet to begin, but it is expected to be operational sometime in 2010.