silverdawn
Well-Known Member
Hi,Intending to go from the Crouch round to Heybridge for the July regatta, can anyone tell me if any of the existing buoys have been removed and replaced with the new buoyage.
In Practical Boat Owner which I received today Crouch Harbour Authority state that work will take place 20 June 2011 with the removal of 16 existing buoys and the installation of 30 new
all lit. Intend to sail round on the 29th June will I come across a fleet of working vessels! or
even worse a barren seascape without any buoys, any information would be very welcome.
I have downloaded the free chartlet complete with waypoints showing the new proposed buoyage.
In Practical Boat Owner which I received today Crouch Harbour Authority state that work will take place 20 June 2011 with the removal of 16 existing buoys and the installation of 30 new
all lit. Intend to sail round on the 29th June will I come across a fleet of working vessels! or
even worse a barren seascape without any buoys, any information would be very welcome.
I have downloaded the free chartlet complete with waypoints showing the new proposed buoyage.