cindersailor
Well-Known Member
I have just received the survey report on a GRP boat I have put a deposit on. There is some rot in the main bulkhead (plywood), and a new mast compression post is needed. I have asked a shipwright to estimate the cost of putting it right. The broker suggests that it is normal to split the cost of this sort of work 50/50 with the seller, is this the case or should I hang out for a reduction in price to cover the full cost?