smithy
Well-Known Member
In the past the mooring contractor always used a continuous multiplat riser from the chain to a soft eye on the boat. The mooring buoy was always tied on to this with a short length of rope using a rolling hitch. I changed mooring contractor. He renewed the riser but this time put a loop in the multiplat tying the buoy to this. It just looks a bit unprofessional to me. Am I worrying about nothing?
