Drone survey operations at the London Array WF start on 27th July and ROV survey operations on 28th July at various locations within the Wind Farm. The Lieutenant P and Master P are the workboats and will impose a 250m and 500m restricted zone respectively at the locations. the locations are not specified and locations within the Farm are typically subject to depth and weather conditions. Always call up any LAL vessel before entering. I would be surprised if anyone was significantly hampered.