alienzdive
Well-Known Member
I have a Lofrans windlass fitted on my boat with the additional rope drum, there is also a cockpit switch. I have been on boats before where the anchor can be easily lifted and dropped from teh cockpit at the flick of a switch.
I am having difficulty seeing how the cross over from rope to chain happens in the current configuration. However to make things even stranger, where there is a bulge/shackle/knot, for instance between the rope and the chain, it will not fit into the hole that passes the line through into the anchor locker. The bulge is just to big and this includes a tightly spliced join, which would be the narrowest option.
Any one know what I am doing wrong, or is this a poor design feature??
I am having difficulty seeing how the cross over from rope to chain happens in the current configuration. However to make things even stranger, where there is a bulge/shackle/knot, for instance between the rope and the chain, it will not fit into the hole that passes the line through into the anchor locker. The bulge is just to big and this includes a tightly spliced join, which would be the narrowest option.
Any one know what I am doing wrong, or is this a poor design feature??