Repeat below of Byrons post late November. If this still stands looks as if you have a problem before 22nd March..............see Romney and Boveney below!

Days lock
26 November to 21 December 2001 AND 7 January to 1 March 2002
Tail Layby Replacement

Mapledurham
5 November to 21 December 2001
lockgate Replacement

Hambleden
5 November to 30 November 2001
Breakwater Reconstruction

Romney *
3 December to 21 December 2001 AND 7 January to 22 March 2002
Head and Tail Layby Replacement

Blakes
26 November to 21 December 2001 AND 7 January to 8 March 2002
lock Bullnose Reconstruction and Tail Layby Replacement

Abingdon
7 January to 22 March 2002
Head Layby Replacement

Grafton
7 January to 3 February 2002
lockgate Resheeting

Caversham
7 January to 22 March 2002
lockcut Bank Reconstruction

Godstow
7 January to 20 January 2002
lock Hydraulics Replacement

Boveney *
11 February to 17 March 2002
lockgate Replacement

Sandford
11 February to 24 February 2002
lockgate Pintle Replacement

NB> The locks with an asterisk are the one's affecting boats travelling downstream from Windsor





TonyR
boatone@boatsontheweb.com
 

byron

RIP
Joined
16 May 2001
Messages
9,584
Location
UK -Berks
Visit site
Sometimes you can stil get through even when they are officially closed. Sometimes a polite crawling call to a lock keeper will get you through on a pre-arranged date.