Sorry to not have attached these to the "Shock Horror" thread.
I hope attached are the pictures of the current situation at Hurley, which I took this afternoon. There still appears to be plenty of work left to do, but is certainly looks like a good job, especially the gleaming inside of the lock chamber, not that it'll last long. I think the metal work across the lower gates might be some sort of brace while the construction was in progress. I'm sure some Civil Engineer out there can advise?
Hopefully all the work will be done and dusted by the end of March as we move out of Temple and up to Hambleden then.
Poor old Narrow Boat has got a long wait.......
I hope attached are the pictures of the current situation at Hurley, which I took this afternoon. There still appears to be plenty of work left to do, but is certainly looks like a good job, especially the gleaming inside of the lock chamber, not that it'll last long. I think the metal work across the lower gates might be some sort of brace while the construction was in progress. I'm sure some Civil Engineer out there can advise?
Hopefully all the work will be done and dusted by the end of March as we move out of Temple and up to Hambleden then.
Poor old Narrow Boat has got a long wait.......