Dino
Well-Known Member
A friend of mine did a delivery from Bergen in Norway to Dublin on a Nordwest 370 last year. They did the crossing from Bergen to Lerwick as the first leg, around 210nm averaging 20-25 knots. Then down to Inverness and through the Caledonian Canal.
I’m keen to do the trip from Cork to the Scillies next year but only if I got a very settled spell of calm weather. I’ve done it on a 50ft sailing boat in the Fastnet Race but never in a motorboat.
I’m keen to do the trip from Cork to the Scillies next year but only if I got a very settled spell of calm weather. I’ve done it on a 50ft sailing boat in the Fastnet Race but never in a motorboat.