Appleyard
Well-Known Member
Having read the thread re the probable enforcement of pump out holding tanks in Turkey..Can I move the discussion on to the technicalities of the process?
How is it carried out? is there a rigid pipe which will be dipped into the tank by the dockside unit which sucks out the waste ? If so what diameter will it be?
I ask this as I would be able to cut a hole in the deck directly above the tank fit a short pipe directly down to a new fitting on the tank,and obviously install a screw on deck fitting . At present the tank empties by gravity when I open the seacock....we always do this when there is an English yacht astern (ONLY JOKING!!!!!!!).
Anyway....what do we need to do if we want to keep the Turks happy?
How is it carried out? is there a rigid pipe which will be dipped into the tank by the dockside unit which sucks out the waste ? If so what diameter will it be?
I ask this as I would be able to cut a hole in the deck directly above the tank fit a short pipe directly down to a new fitting on the tank,and obviously install a screw on deck fitting . At present the tank empties by gravity when I open the seacock....we always do this when there is an English yacht astern (ONLY JOKING!!!!!!!).
Anyway....what do we need to do if we want to keep the Turks happy?