NormanS
Well-Known Member
Please explain. The thought has occurred to me but couldn't see the connection. The supplied line is soft plastic and, as it commences its run in the engine room, I don't think it is appropriate safety wise.
When I installed my (Eberspacher) heater, several years ago and before cheaper models were available, I used 2mm copper tube. I don't know the full technical reasons why the makers say 2mm, but they do, and presumably have a reason. My guess would be that if you use a bigger size, there is more chance of fuel running back and emptying the tube, making starting more difficult. Sometimes, if all else fails, follow the instructions. ?