Heads Refurbishment

Talulah

Well-Known Member
Joined
27 Feb 2004
Messages
5,826
Location
West London/Gosport
Visit site
Spent the last couple of weekends refurbishing both heads and the holding tank.

One leaking toilet
T1_zpsac847995.jpg


Hot Water Tank coming out
HWTankcomingout_zps15e344b5.jpg


Holding Tank coming out
HoldTankInLocker_zps40d6b198.jpg


HoldTank1_zps59953356.jpg


Holding Tank with access port enlarged
HTWithCutouts_zps26fc7fb7.jpg


Rear Heads stripped out
strippedout_zps32efff48.jpg


The workshop
OutsideWorkshop_zpsdd21c597.jpg


Holding Tank with new ports being leak tested.
HTLeakTest2_zpsa28ec28d.jpg


Rear Heads Completed complete with new plinth
CompleteRearHeads_zpscb366d7d.jpg


Main heads completed
CompleteMainHeads_zpsfb278dc1.jpg


Big thanks to The Insert Company for doing a Saturday delivery at the last minute at no extra cost.
http://www.theinsertcompany.com/
 
Last edited:
Top