skenn_ie
Well-Known Member
This is also posted in the calssic boats forum:
Hi, Can anyone advise me on the best procedure for aligning Engine/gearbox assembly with the propshaft. I am replacing Portisham's complete propulsion system with 2, 250HP engines with attached Twindisk MG507A's. Engine cradle will rest on original gearbox rails, engines -0.5 degrees from ship's datum(keel). Cradle has been made with the angles incorporated, so, theoretically, the top of the cradle should be horizontal, with underside resting on old rails, and centreline aligned laterally and vertically, with shaft.
I am also looking for dimensions of Twindisk's 11 1/2" "rubber block" coupling. I can send a sketch by email to anyone who can advise on this.
Thanks
Shane
Hi, Can anyone advise me on the best procedure for aligning Engine/gearbox assembly with the propshaft. I am replacing Portisham's complete propulsion system with 2, 250HP engines with attached Twindisk MG507A's. Engine cradle will rest on original gearbox rails, engines -0.5 degrees from ship's datum(keel). Cradle has been made with the angles incorporated, so, theoretically, the top of the cradle should be horizontal, with underside resting on old rails, and centreline aligned laterally and vertically, with shaft.
I am also looking for dimensions of Twindisk's 11 1/2" "rubber block" coupling. I can send a sketch by email to anyone who can advise on this.
Thanks
Shane