dick_james
Well-Known Member
it's well worth the effort. I fitted a Mikuni a few years ago. To re-iterate previous posts - plan all cable/fuel line/duct routes before hand. Get the right size goodquality hole saws. Insulate the ducting when you install it. I found that drilling the holes for the ducting took the most time.