EugeneR
Well-Known Member
I am being quoted just over £4,000 to have my Fairline Phantom 38's shaft seals replaced with Tides Marine ones.
Of that, £504 is to have the shaft logs removed and machined to take the new seals. I am told that, a year or so after my boat was made in 2001/2, Fairline started supplying them with Tides' seals.
Does anyone know if it is possible to simply and easily replace the logs with those supplied by Fairline on the newer boats i.e. 2002/3 onwards?

The other part, of course, is the 32 hours' labour required - this includes dropping the (easily accessible) rudders and removing / refitting the shafts.
As alternative, I asked them how much to repack the existing seals - been quoted 4 hours' labour, is that normal?
Or am I being shafted?
Of that, £504 is to have the shaft logs removed and machined to take the new seals. I am told that, a year or so after my boat was made in 2001/2, Fairline started supplying them with Tides' seals.
Does anyone know if it is possible to simply and easily replace the logs with those supplied by Fairline on the newer boats i.e. 2002/3 onwards?

The other part, of course, is the 32 hours' labour required - this includes dropping the (easily accessible) rudders and removing / refitting the shafts.
As alternative, I asked them how much to repack the existing seals - been quoted 4 hours' labour, is that normal?
Or am I being shafted?