demonboy
Well-Known Member
Yep, we really have spent six months in the yard now. Here's how Esper is looking in the saloon looking aft.
We're redesigning the ceiling and putting larger boards up. More importantly we're losing the horrible vinyl covering and will be replacing them with white laminate. You'll also notice some conduits running the length of the boards. These are to accommodate the new LED strip lights we'll be installing (picture of them in the next update).
The coffee table/dining table is almost complete and here you can see the pedastal, made in PSS boatyard, fitted to the floor. This will be completely removable to free up more floor space when we don't need the tables.
Here's Yoong, the man behind all the stainless work, doing a bit of aluminium welding.
There's a six month video round-up here: http://followtheboat.com/2014/08/25/esper-refit-6-month-roundup/
We're redesigning the ceiling and putting larger boards up. More importantly we're losing the horrible vinyl covering and will be replacing them with white laminate. You'll also notice some conduits running the length of the boards. These are to accommodate the new LED strip lights we'll be installing (picture of them in the next update).
The coffee table/dining table is almost complete and here you can see the pedastal, made in PSS boatyard, fitted to the floor. This will be completely removable to free up more floor space when we don't need the tables.
Here's Yoong, the man behind all the stainless work, doing a bit of aluminium welding.
There's a six month video round-up here: http://followtheboat.com/2014/08/25/esper-refit-6-month-roundup/