Quite a bit of work over the next few winters, should be able to manage most of the work myself, if need be I will call in a shipwright for help or advice.
1 strip all paint and varnish. 2 remove all interior furniture.3 remove steel strap floors,new bolts as they have all rusted re galv floors. 4 New engine. 5 check hood end fastenings and garboards and re-fasten. 6 several area of timber need cutting out and replacing.7 rake out caulking and replace. 8.possible a few ribs..9. New cooker.
If in Barry call in and see the boat,she will be undercover in the club workshop,after coming up by road on the 24th.