Yealm
Well-Known Member
Having decided to get my boat rigged for a spinnaker, I now a serious shortage of clutches !
I love having ropes led back to the cockpit, but I have only 8 coachroof clutches but 13 ropes, so 5 will have to go back to the mast (it's going to be impossible I think to install further clutches).
Which ropes do you think I should move back to the mast out of the following ? (contessa 32)
Main halyard
Jib halyard
Spinnaker halyard
Spare halyard
Main outhaul
Main reef 1
Main reef 2
Main reef 3
Kicker
Cunningham
Topping Lift
Pole up
Pole down
I love having ropes led back to the cockpit, but I have only 8 coachroof clutches but 13 ropes, so 5 will have to go back to the mast (it's going to be impossible I think to install further clutches).
Which ropes do you think I should move back to the mast out of the following ? (contessa 32)
Main halyard
Jib halyard
Spinnaker halyard
Spare halyard
Main outhaul
Main reef 1
Main reef 2
Main reef 3
Kicker
Cunningham
Topping Lift
Pole up
Pole down
Last edited:
