dom
Well-Known Member
As a related question, does anyone know a sensible way to re-rig a Jeanneau looped main sheet, which has been run back to the cockpit winches to a single coach roof winch?
We were told the coachroof winches are unable to take the mainsheet load - Jeanneau 409 / Sunsail 41
Really annoying to essentially have a wasted winch, as they have two coach roof winches, and two cockpit winches.
Who told you that?