Daydream believer
Well-Known Member
Its the same as the farm shackles I used to use, grossly over size for the job, change every year, not a prob!
S
But hiring the tug to lift & then return & replace the mooring is expensive ( £500-00 per visit)
Its the same as the farm shackles I used to use, grossly over size for the job, change every year, not a prob!
S
Is this a permanent join? If so, have it welded.But hiring the tug to lift & then return & replace the mooring is expensive ( £500-00 per visit)
Is this a permanent join? If so, have it welded.
Not really practical to do any welding at the mooring but it did occur to me that it would be possible to soft solder the pin in the shackle, anyone know how the tin/silver/lead in solder would affect the galvanised coating ?
Also, what temperature does zinc melt at ? Would it be possible to solder the pin in place using zinc wire instead of standard solder ? Anyone done this ?
Boo2
Its the same as the farm shackles I used to use, grossly over size for the job, change every year, not a prob!
S