[176470]
...
Technical trials update. After three tidal cycles the dredge area near the harbour entrance is starting to become clear. The channels and foregrounds have been reduced in level by a little over half a metre and are now well below the impound level (when the gate is in the up position). We will keep you updated. The team are doing great work.