Babylon
Well-Known Member
I'm thinking of fitting a manual windlass, mainly to ease the burden of recovering a lot (up to 80m) of 8mm chain and a heavier anchor. Am I correct in thinking that I can also simply lift the chain off the gypsy at any time and haul the chain in hand-over-hand and down the hawse-pipe as I currently do - more quickly, especially once the majority of weight has been recovered - or does the setup preclude this?