It seems there are as many ways to lay a mooring as ways of skinning a cat, and I've had slightly different advice from everybody I've asked.
However I'm now coming towards a plan and would like some feedback before I go hauling lumps of metal off the back of boats.
The mooring is to hold a Wayfarer (16ft, very light) so a lot of the advice has been overkill. The water will vary from about 6ft to 22ft depth, and the ground is soft mud. Th location isn't very sheltered but I take the baot home in the worst weather anyway.
My plan is to lay two sinkers, which are 75kg cast iron manhole covers. I will make two holes in each one, and feed the ground chain through one hole and then put on as big a shackle as I can get to stop it pulling through the hole. The other hole will take a length of rope which is tied on to the ground chain; the idea is to form a 'Y' with two attach points to the manhole cover. Is rope a terrible idea? Maybe I'd be better with a short length of chain and more shackles?
That would mean buying more stuff that I don't have!
Anyway the ground chain is 4m in length, and 13mm galv. In the middle I'll shackle on the riser, which is an 8m length of 10mm chain. At the top of this chain I'll fit a swivel, and then a short length of 25mm nylon leading to the buoy.
However I'm now coming towards a plan and would like some feedback before I go hauling lumps of metal off the back of boats.
The mooring is to hold a Wayfarer (16ft, very light) so a lot of the advice has been overkill. The water will vary from about 6ft to 22ft depth, and the ground is soft mud. Th location isn't very sheltered but I take the baot home in the worst weather anyway.
My plan is to lay two sinkers, which are 75kg cast iron manhole covers. I will make two holes in each one, and feed the ground chain through one hole and then put on as big a shackle as I can get to stop it pulling through the hole. The other hole will take a length of rope which is tied on to the ground chain; the idea is to form a 'Y' with two attach points to the manhole cover. Is rope a terrible idea? Maybe I'd be better with a short length of chain and more shackles?
That would mean buying more stuff that I don't have!
Anyway the ground chain is 4m in length, and 13mm galv. In the middle I'll shackle on the riser, which is an 8m length of 10mm chain. At the top of this chain I'll fit a swivel, and then a short length of 25mm nylon leading to the buoy.