wormanj
New Member
I have not hoisted a spinny for some time now and can't remember how the running rig goes. Obviously outside of everything but sheets and guys???? If I remember correctly the active guy goes through the jaws of the pole and attaches to the sail. The guy normally has an extra shackle ring for securing the sheet to. Both being led aft. Is that right or is it the other way round, ie. Sheet through pole and attached to sail with guy attached the the extra shackle point on the sheet. Stupid question but one I would like to clarify