castaway
Well-Known Member
My mast is raked back at the top by about 12 inches. Now I want to correct this to get it vertical.
Can anyone tell me how much I would have to take off the forestay (the bottle screw has run out of adjustment) to bring the masthead forward by 12ins.
The mast is 40ft and I will have to check this but the mast step is 13ft aft of the stem head fitting.
I am doing this as the mast is down at present and although it makes it easier for the job of shortening the forestay it doesnt make it easier for estimating how much to chop off.
Also what is the best way of cutting rigging wire? In the past I have done it by cutting a nut in half and placing it over the wire ( 1/2 either side) and clamping in the vice.... I found that this held the wire together whilst I cut with a hack saw, otherwise all the strands tend 'ping' off...Poss there are better ways ??
Thanks Nick
Can anyone tell me how much I would have to take off the forestay (the bottle screw has run out of adjustment) to bring the masthead forward by 12ins.
The mast is 40ft and I will have to check this but the mast step is 13ft aft of the stem head fitting.
I am doing this as the mast is down at present and although it makes it easier for the job of shortening the forestay it doesnt make it easier for estimating how much to chop off.
Also what is the best way of cutting rigging wire? In the past I have done it by cutting a nut in half and placing it over the wire ( 1/2 either side) and clamping in the vice.... I found that this held the wire together whilst I cut with a hack saw, otherwise all the strands tend 'ping' off...Poss there are better ways ??
Thanks Nick