Kelpie
Well-Known Member
I'm planning on laying a swing mooring for my Wayfarer. I've got two cast iron manhole covers, big and flat and 75kg each, plus two engine blocks as well if I need them. In addition, I've got 4m of 13mm chain and 8m of 10mm.
The ground is soft mud with occasional large stones, not very deep, and there are a few other boats close by so I don't want to be swinging through too big an arc.
Now, am I best laying a single ground chain with two weights on it? Or should I lay all four separately going to a central riser? Or is that much weight overkill for a 16ft dinghy?
The ground is soft mud with occasional large stones, not very deep, and there are a few other boats close by so I don't want to be swinging through too big an arc.
Now, am I best laying a single ground chain with two weights on it? Or should I lay all four separately going to a central riser? Or is that much weight overkill for a 16ft dinghy?