• REMINDER - COVID-19

    Any content, information, or advice found on social media platforms and the wider Internet, including forums such as YBW, should NOT be acted upon unless checked against a reliable, authoritative source, and re-checked, particularly where personal health and liberty is at stake. Seek professional advice/confirmation before acting on such at all times.

    Users who are found to promulgate FAKE NEWS on the forum in regard to this issue, intentional or otherwise, may find their access terminated. It is your responsibility to provide references to bona fide sources.

    FAKE NEWS, in this regard, is that which is posited by organisations, media, etc., that is repeated on the forum, or used to support personal opinion/hypothesis posted by users - FAKE NEWS is not necessarily the personal opinion/hypothesis being posted in itself, any issues with such should be challenged respectfully.

    IN ADDITION it seems that conspiracy theories are finding their way onto the forum. This is not the place for such content. Users who post it may find their access limited or permanently suspended. Please leave it where you find it.

Bray to Penton Hook 02/12/2020

Mark26

Active member
Joined
17 Nov 2017
Messages
116
Location
Penton Hook
Penton Hook T 07:30 12/12/20
4CF52618-76B8-4DA0-A4A8-9A5782E8BFBE.jpeg
It took us 5.5 hrs to run downstream from Bray to Penton Hook today, including a 1.5 hr delay at Bell Weir Lock due to a faulty sluice gate.

222944A2-BC1C-4C12-BBB7-027B41FC33BE.jpeg

The river was very quiet, only saw one other motorboat moving and a couple of early morning rowers.
We saw more swans than humans in Windsor.
AF388273-5B6A-4FC1-895D-C9D166FA6F60.jpeg
There was some work being carried out at Old Windsor Lock. The EA had put out a notice about it a couple of days before our trip, saying there could be delays of up to two hours, and a lock keeper would be on duty all day to manage the site. Out of the 5 locks we passed he was the only keeper we saw, not uncommon at this time of the year, and certainly no problem.

We were extremely lucky as the workers at Old Windsor Lock were just setting up as we got there, and they said that soon the lock would be closed for the rest of the day.

We were very pleased to get through Old Windsor, we thought it would be plain sailing the rest of the way, but at the next lock, Bell Weir, we couldn’t fill it enough to get the head gates open. Two of the tailgate sluices were not closing properly and although the lock allowed us to open the head gate sluices, it wouldn’t fill completely. So we called the EA, who sent the Lock Keeper from Old Windsor to come to our aid. He did arrive very quickly after we made the phone call, the only reason we had a 1.5hr delay was that we spent 1hr trying to make the lock work ourselves before calling. We cycled the lock and opened and shut the gates with the sluices open hoping that if something had stuck in there, it might wash out. But all to no prevail.

The lock keeper saw the problem and took the lock out of public power, which enabled him to open the sluices fully, thereby filling the lock to let us through before calling out an engineer.
 

realslimshady

Member
Joined
31 Jul 2007
Messages
434
Location
Andover
Do you know how long the work at Old Windsor lock is going on for? We should be following in your footsteps next week and could do without any hold ups...
 
Top