aztec
Active member
got it sorted, boat that is.. nice man to come and replace/rebuild wheelhouse roof, and sort out bits in cabin. he's going to insulate the roof, between the outer plywood skin and the inner pine T&G liner, but he's said to paint it rather than to use varnish (?) also lining the deckhead in the cabin and the sides of the seating bit, seen it on other boats and it looks very clean and tidy.
he's also going to open up the doorway (companionway?) into the cabin. 'cos i'm a big bugger. oh and raise the wheelhouse by 1 1/2". other mods are to get shot of the toilet, in favour of a cassette one. and make the toilet into a shower. rebuild the kitchen bit to use room better. and make a hardwood table to replace the melamine on i have now.
he's also suggested that i replace the veneered doors inside with louvred ones to allow air to circulate, and make a dorade box for the escape hatch on the foredeck. all in exchange for some mechanical work to his boat, making him some davits, designing a gear change etc. have a look at my boat on the home page and express a view, to what other things would benefit my family. your experience is valued. the work should be done by next spring/summer so look out then!
http://homepage.ntlworld.com/s.amos/index.html
regards steve.
he's also going to open up the doorway (companionway?) into the cabin. 'cos i'm a big bugger. oh and raise the wheelhouse by 1 1/2". other mods are to get shot of the toilet, in favour of a cassette one. and make the toilet into a shower. rebuild the kitchen bit to use room better. and make a hardwood table to replace the melamine on i have now.
he's also suggested that i replace the veneered doors inside with louvred ones to allow air to circulate, and make a dorade box for the escape hatch on the foredeck. all in exchange for some mechanical work to his boat, making him some davits, designing a gear change etc. have a look at my boat on the home page and express a view, to what other things would benefit my family. your experience is valued. the work should be done by next spring/summer so look out then!
http://homepage.ntlworld.com/s.amos/index.html
regards steve.