For some reason I'm no longer included in EA's trusted list of folks to be circulated; must have upset somebody. However, whilst awaiting the Local Authority's culinary peregrinations, I stumbled upon this:-
Winter works schedule
It seems that all the unelectricificated (out of hours powered) locks are due to be modified this winter - but with the exception of Marlow (I wonder why?).
Of course some may fall by the wayside, as often happens, but hey, the thought is there.
Would be wonderful, were it not for the housing issue....
I note that the engineering manager is one Paul Power