oldgit
Well-Known Member
The refurbishment of Teston lock has taken a bit longer than expected due to the old lock being a bit more knackered than was previously thought.
Should be open towards end of April.
http://allingtonlock.co.uk/teston01.pdf
Not sure when they will be having a go at East Farleigh.The lower gates are a bit leaky at the cill and woe betide anybody not opening the upper sluices fully,cos you will be into long wait for the chamber to fill otherwise.
East Farleigh Lock,
Should be open towards end of April.
http://allingtonlock.co.uk/teston01.pdf
Not sure when they will be having a go at East Farleigh.The lower gates are a bit leaky at the cill and woe betide anybody not opening the upper sluices fully,cos you will be into long wait for the chamber to fill otherwise.
East Farleigh Lock,
Last edited: