Portland Billy
Well-Known Member
Several years ago (about fifteen, I think) I took a Fairline Phanton Mk1 from the Thames to the Medway and we were able to go up past Maidstone and eventually ended our trip a few locks further up at a rather good boozer. We had the radar arch lowered all the way.
Since then I've had several larger boats and haven't ventured further than Chatham.
I seem to recall that one of the factors in the trip was the bridge before Allington Lock (tidal side) - the idea being to ensure sufficient water depth combined with air draught, and not have too long to wait for the lock.
I would like to venture up to Maidstone with my present craft which has a fixed air draught of 12 feet - is it possible to navigate this bridge ? Or should I just forget it.
I know there's not much to recommend Maidstone - but we have relatives there.
Since then I've had several larger boats and haven't ventured further than Chatham.
I seem to recall that one of the factors in the trip was the bridge before Allington Lock (tidal side) - the idea being to ensure sufficient water depth combined with air draught, and not have too long to wait for the lock.
I would like to venture up to Maidstone with my present craft which has a fixed air draught of 12 feet - is it possible to navigate this bridge ? Or should I just forget it.
I know there's not much to recommend Maidstone - but we have relatives there.