Jamesuk
Well-Known Member
Hi,
We just pulled into a town quay and were provided ground lines, but when I reached the bow the angle of the line was very tight and so had we been an 80ft yacht instead of 63 we probably would have had them going down at almost vertical from the cleat. Im used to ground lines being long and progressively hard to pull in. These were like I was pulling on the concrete/screw mooring block directly.
One chap on a boat next door suggested using the mid ship cleats. Any thoughts on tying up a boat with 30ft of yacht to the bo,w unattached. Or perhaps one on the mid ship and one at the bow?
Having only done this when not enough boats had ground lines (Sunsail) we would use mid ships cleats to act in principle as the same as this chap mentioned but on other yachts (springs) but nothing larger than a light 45footer we have 37 tonnes to consider. Having already made the dock mans pontoon ring look like an egg......
Cheers
Ps the proper way to have done it: ahh we have a problem ok we will come back in but this time drop the anchor then collect the lazy lines as back up.
We just pulled into a town quay and were provided ground lines, but when I reached the bow the angle of the line was very tight and so had we been an 80ft yacht instead of 63 we probably would have had them going down at almost vertical from the cleat. Im used to ground lines being long and progressively hard to pull in. These were like I was pulling on the concrete/screw mooring block directly.
One chap on a boat next door suggested using the mid ship cleats. Any thoughts on tying up a boat with 30ft of yacht to the bo,w unattached. Or perhaps one on the mid ship and one at the bow?
Having only done this when not enough boats had ground lines (Sunsail) we would use mid ships cleats to act in principle as the same as this chap mentioned but on other yachts (springs) but nothing larger than a light 45footer we have 37 tonnes to consider. Having already made the dock mans pontoon ring look like an egg......
Cheers
Ps the proper way to have done it: ahh we have a problem ok we will come back in but this time drop the anchor then collect the lazy lines as back up.