I have had the misfortune to have to transit the bridges a number of times in the last few days.
Be aware that the Schedules seem to change on a hourly basis at the moment.
Monday for instance twin sails opens 09.30 Poole bridge according to printed info from harbour commissioners 0945 which passes happily, on calling the bridge operater oh no sir we are running a revised schudule we will lift 1000.
Today from a mooring between the bridges twin sails lifts 10.30 revised schudule we think so slip moorings at 1055 to discover oh no sir 10.45 next lift is 11.40 hmm ok. So to go back in the 'indicative' lift is at 1500 for Poole bridge. So I ring the bridge operator and ask when I can go thru 1500 he says ok that is a indicative time says I, oh yes sir we'll probably lift at 1440 depending on how many boats are waiting. This is helpful when you are tied up thinking slip lines at 1450 potter to the bridge from Poole quay marina to discover its opened 10 min earlier......
The bridge operators numbers are on the web site in future I shall be calling them to discover what time they will open the bridges as currently they seem to open when someone feels like it.
There will be a lot of p###ed of boat owners soon
Be aware that the Schedules seem to change on a hourly basis at the moment.
Monday for instance twin sails opens 09.30 Poole bridge according to printed info from harbour commissioners 0945 which passes happily, on calling the bridge operater oh no sir we are running a revised schudule we will lift 1000.
Today from a mooring between the bridges twin sails lifts 10.30 revised schudule we think so slip moorings at 1055 to discover oh no sir 10.45 next lift is 11.40 hmm ok. So to go back in the 'indicative' lift is at 1500 for Poole bridge. So I ring the bridge operator and ask when I can go thru 1500 he says ok that is a indicative time says I, oh yes sir we'll probably lift at 1440 depending on how many boats are waiting. This is helpful when you are tied up thinking slip lines at 1450 potter to the bridge from Poole quay marina to discover its opened 10 min earlier......
The bridge operators numbers are on the web site in future I shall be calling them to discover what time they will open the bridges as currently they seem to open when someone feels like it.
There will be a lot of p###ed of boat owners soon