tillergirl
Well-Known Member
I have added two Wind Farm updates - the usual London Array weekly notice and a longish notice from Dong on the Demonstration Project (the installation of two larger turbines on the Spitway side of existing Gunfleet Wind Farm). Pre Lay Grapnell runs will be started soon in prep for cable laying.
As usual at www.eastcoastsailing.co.uk and www.crossingthethamesestuary.com
As usual at www.eastcoastsailing.co.uk and www.crossingthethamesestuary.com